| Under Construction |
| Multi - Event Center |
| Location: |
Punta Gorda, Florida |
| Owner: |
Charlotte County Government |
| Architect: |
Harvard Jolly, Inc. |
| Contract Type: |
Design / Build |
| Contract Amount: |
$19,649,796 |
| Completion Date: |
August 2008 |
| Description: The Charlotte Harbor Event and Conference Center is a 45,230 SF facility built for the purpose of providing the citizens of Charlotte County a state of the art convention and event center to replace the structure that was destroyed by Hurricane Charley. The project is located on the Peace River in downtown Punta Gorda, resulting in numerous site elevation and soil condition challenges that needed to be resolved during an extensive design phase effort.
Building amenities include a 19,857 SF multipurpose hall, with a seating capacity of 2,100 complete with theatrical stage rigging and lighting, meeting and dressing rooms, and office areas for on site staff. A food service area capable of serving 400 guests with a full kitchen is also included.
The harbor-walk along the Peace River boundary includes brick pavers, gazebos and an area for riverfront events. The building construction consists of structural steel, concrete tilt walls and a fibertight barrel tile metal roof system. Mechanical systems include a chilled water plant for air conditioning and rollup generator hookup for emergency power. The building is built to withstand 130 mph wind speeds with an importance factor of 1.15.
|
|



|
| Fire Station # 2 |
| Location: |
Punt Gorda, Florida |
| Owner: |
City of Punta Gorda |
| Architect: |
Wilder Architecture, Inc. |
| Contract Type: |
Design / Build |
| Contract Amount: |
$2,045,124 |
| Completion Date: |
August 2008 |
Description: Design/Build construction of a approximately a 7,000 SF facility, 2 apparatus bays, bunks for 6, separate office space for a community police officer, fueling facilities for fire trucks, full emergency generator backup, decontamination facilities, designed to be hurricane resistant (in excess of code requirements.
|
|

|
| Southwest Florida Enterprise Center |
| Location: |
Ft Myers, Florida |
| Owner: |
City of Ft. Myers |
| Architect: |
Parker/Mudgett/Smith Architects, Inc. |
| Contract Type: |
CM @ Risk |
| Contract Amount: |
$ 3,408,429 |
Completion Date: |
August 2008 |
Description: Two, single story, high bay buildings suitable for light industrial and service space with the required parking. One building is approx. 22,000 SF and the second is 18,000 SF. The two buildings will serve as a business incubator for existing and future private business in Fort Myers. Both buildings utilize tilt-up construction technology.
|
|

|
| Charlotte County Jail Expansion |
| Location: |
Charlotte County, Florida |
| Owner: |
Charlotte County Government |
| Architect: |
Strollo Architects, Inc. |
| Contract Type: |
CM @ Risk |
| Contract Amount: |
$ 30,000,000 |
Completion Date: |
April 2010 |
Description: The jail is located on an 80-acre site on Airport Road near the Charlotte County Airport. The jail expansion program will double the present 528 bed facility through the following: Modifications To
Existing Facilities – Modifications to approximately 21,000 SF of existing facilities include the following:
• Administrative/Interview Rooms
• Medical/Mental Health Records
• Mail Room
• Locker Room
• Facilities Storage
• Laundry
IN ASSOCIATION WITH BOVIS LEND LEASE |
|

New Facilities – The new facilities (approximately 212,000 SF) considered outside the existing jail footprint are as follows:
• Housing Unit (two tier)
• Special Management Housing (two tier)
• Intake and Release
• Sally Port
• Juvenile Housing Unit
• Property Room
• Work Release Building
• Maintenance Building
• Training/Armory Building
• Video Visitation Building
|
| Charlotte County Sports Park Renovation / Expansion |
| Location: |
Charlotte County , Florida |
| Owner: |
Charlotte County Government |
| Architect: |
HOK |
| Contract Type: |
Design / Build |
| Contract Amount: |
$ 27,000,000 |
Completion Date: |
December 2008 |
Description: The new Tampa Bay Rays Spring Training Facility will include an open air natural grass stadium which will meet the first class Major League Baseball Spring Training Standards with approx. 6,000 fixed seats (including premium seating) an outfield berm and other general admission areas accommodating up to 1,500 fans. Additionally a 40,000 SF major & minor league clubhouse, one full size grass major league practice field, one grass half field, and four full size minor league practice fields are being constructed. Also including an on-site parking lot for +/- 1500 vehicles.
A JOINT VENTURE WITH HUNT CONSTRUCTION
|
|

|
| FedEx Freight Service Center Expansion |
| Location: |
Orlando , Florida |
| Owner: |
FedEx Freight |
| Architect: |
FedEx Freight |
| Contract Type: |
CM @ Risk |
| Contract Amount: |
$ 4,571,766 |
Completion Date: |
September 2008 |
Description: 51,791 SF - 85 door dock and pod addition and yard expansion to existing FedEx Freight Facility, including new truck parking, and staging area. The project has 129,000 SF of demo 8" concrete paving, 146,000 SF new 8" reinforced concrete paving, 276,000 SF of 3" asphalt paving, and 2,540 LF reinforced concrete curb & gutter.
|
|
 |
| Palm View Elementary School |
| Location: |
Bradenton, Florida |
| Owner: |
School District of Manatee County |
| Architect: |
Fleischman Garcia Architecture |
| Contract Type: |
CM @ Risk |
| Contract Amount: |
$11,600,000 |
| Completion Date: |
August 2009 |
| Description: Construction of a new 47,140 SF two story building with 12 classrooms, storage area, a new first floor media center, and a new chiller plant. Various MEP upgrades to existing classroom buildings. New upgrades to the kitchen and dining facilities and multipurpose area. A new traffic flow to allow for 60 car queuing and parking area. New fencing and access control to secure campus. Overall square footage – 95,115. |
|

|
| Harbor Inn Resort & Marine Yacht Club |
| Location: |
Punta Gorda , Florida |
| Owner: |
Harbor Resort Hotel, LLC |
| Architect: |
Automated Consulting Service, Inc.
Roger Fry & Associates Architects, P.A. |
| Contract Type: |
Lump Sum |
| Contract Amount: |
$7,483,265 |
Completion Date: |
April 2009 |
Description: The project consists of a five story, 106 room hotel, along the Peace River in downtown Punta Gorda, Florida for Four Points by Sheraton. Amenities includes a pool, spa, fitness center, full service kitchen with restaurant, conference facilities, courtyard, and waterfront promenade improvements. |
|

|
 |
| Pre-Construction |
|
| Pinch A Penny Headquarters |
| Location: |
Largo, Florida |
| Owner: |
Pinch A Penny |
| Architect: |
Fleischman Garcia Architecture |
| Contract Type: |
CM @ Risk |
| Contract Amount: |
$20,000,000 |
| Construction: |
October 2008 - November 2009 |
| Description: Project to include a 45,000 3-story corporate headquarters building and a 200,000 SF manufacturing, warehouse and distribution building. Both buildings to be constructed of tilt-up concrete and will be hurricane hardened structures with back-up mechanical and electrical systems.
|
|

|
| LCEC Emergency Operations Center |
| Location: |
N. Ft. Myers, Florida |
| Owner: |
Lee County Electric |
| Architect: |
Harvard Jolly, Inc. |
| Contract Type: |
CM @ Risk |
| Contract Amount: |
$12,000,000 |
| Construction: |
Currently On Hold |
| Description: 30,000 SF - 3 story office building. 1st floor will have a Call Center, 2nd floor will be the Computer Center and the 3rd floor will be the Systems Operations Control Center. The building will also have a 1 story Public Customer Service Center with drive thru lanes for customer payments. The complex is designed to withstand a Category 5 Hurricane and includes redundant mechanical and electrical systems.
|
|

|
| Christ The King School |
| Location: |
Tampa, Florida |
| Owner: |
Diocese of St. Petersburg |
| Architect: |
Portela & Associates |
| Contract Type: |
CM @ Risk |
| Contract Amount: |
$6,336,516 |
| Construction: |
March 2009 - March 2010 |
| Description: The two-story building will include art and science rooms, teacher planning rooms, bookstore, 22 classrooms for grades K thru 8, a chapel, and a computer technology room. Total enclosed area is approx 36,800 SF. |
|
.jpg)
|
| Tampa International Airport Baggage Claim Replacement Expansion |
| Location: |
Tampa, Florida |
| Owner: |
HIllsborough County Aviation Authority |
| Architect: |
Gresham, Smith & Partners |
| Contract Type: |
Design/Build |
| Contract Amount: |
$ 18,000,000 |
| Construction: |
February 2009 - July 2011 |
Description: This Design/Build project will have a significant impact on the overall operations of the Airport's baggage claim level and ground transportation operations. Extensive planning, coordination and cooperation will be required between all users involved in this area. The project scope includes a new expansion to the east baggage claim area, and a complete replacement of baggage claim devices in the landside terminal complex. New public restrooms, new claim offices, and an additional 8,175 SF of circulation space on both the Red and Blue sides of the baggage claim area will also be provided. |
|
|
| Public Works & Utilities Complex |
| Location: |
Punta Gorda , Florida |
| Owner: |
City of Punta Gorda |
| Architect: |
Reynolds, Smith & Hills |
| Contract Type: |
Design/Build |
| Contract Amount: |
$ 8,500,000 |
| Construction: |
November 2008 - September 2009 |
| Description: Construction of a new headquarters for the Public Works and Utilities Department. Including Drive-In payment center, shop spaces, equipment and vehicle storage facilities and administrative offices. |
|
|
| Hendry County Emergency Operations Center |
| Location: |
Hendry County, Florida |
| Owner: |
Hendry County Government |
| Architect: |
BSSW Associates |
| Contract Type: |
Design/Build |
| Contract Amount: |
$3,400,000 |
| Construction: |
September 2008 - June 2009 |
Description: EOC is 10K SF Emergency Operations Center Hendry County housing emergency management personnel. The building is a hardened single story concrete structure design to Miami-Dade standards for critical facilities with increased requirements resulting in a 200 mph + 1.0 importance factor. The building will include the following features:
• 100% backup generator capabilities
• Helipad
• Communication Tower
• Designed for min 72 hr of self contained
continuous operation not reliant on off site
facilities.
• Designed to high impact standards for
emergency operations facilities to withstand
• 15lb 2x4 @ 50mph.
• Equipped with survivable communications |
|

|
| Ring Power Sales / Repair Store |
| Location: |
Orlando, Florida |
| Owner: |
Ring Power Corporation |
| Architect: |
Stellar Commercial Design |
| Contract Type: |
Lump Sum |
| Contract Amount: |
$12,617,817 |
| Construction: |
July 2008 - August 2009 |
Description: New construction of a 75,938 SF tilt-up concrete and structural steel facility for Caterpillar heavy equipment dealer Ring Power. The building area includes office, warehouse, service/maintenance, oil storage tanks and heavy duty concrete paving, on a 37 acre site. Site work includes public road widening, new lift station and off site sanitary force main construction.
|
|
|
| |
|